Andrian
Living Andrius

Quiet yet central location in Andrian
1- to 4-room apartments available, free apartments not subsidized (except A06)
Construction has already started, completion in autumn 2026

Living comfort at the highest level


ZIMA is realizing an exclusive residential complex with 20 residential units in the idyllic heart of Andrian. Surrounded by picturesque vineyards and blooming apple orchards, this location offers a quiet yet centrally located oasis. The climate house of category "A" convinces with an extremely low energy balance and high-quality equipment that meets the highest demands. All units are individually customizable and have cellar compartments and garages in various sizes. The interior design – from tiles and wooden floors to doors and bathroom furnishings – is completely designed according to the personal wishes of the future residents.

Choose your
dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

House
A B
Floors
Ground 1st 2nd 3rd
Number of rooms
1 2 3 4
Living space
20 m² 120 m²
Price
210000 910000
top (5) House Room floor Living space Price Save
B11 House: B 4 3rd 94 m² 804000
B08 House: B 1 1st 36.39 m² 248000
B04 House: B 2 1st 43.94 m² 315000
B03 House: B 1 Ground 28.05 m² 210000
A06 House: A 3 2nd 68.5 m² 429000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
Living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

Pure quality of life
in a central location


Located halfway between the charming cities of Bolzano and Merano and near Terlan, where the middle and music school, a pharmacy, a butcher shop, sports and ice rinks, and tennis courts are located, Andrian is perfectly positioned. The location of the residential complex is ideal for nature lovers and offers excellent access to the cycle path network. This allows residents to explore the breathtaking landscape and at the same time benefit from the proximity to amenities. In Andrian itself there is a kindergarten and a primary school, a grocery store and an outdoor swimming pool, all of which contribute to making life in this charming village pleasant. In addition, Andrian is home to South Tyrol's oldest winery cooperative, giving residents the opportunity to experience the region's rich wine tradition up close.

To display the Google Maps map, loading the script must be allowed.
  • Good local amenities, a few minutes' drive to Terlan with further shopping opportunities
  • Very good transport connections to Bolzano – approx. 20 minutes by car to the city center
  • Very natural location with numerous local recreation opportunities

CONSTRUCTION PROGRESS

We would be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

November 2025

Haus A: Dacheindeckung fertig, WDVS fertiggestellt, aktuell Armierungsspachtelung, im EG und 1. OG Rohinstallationen abgeschlossen, Fußbodenheizung verlegt, Estrich eingebracht, Innenputzarbeiten folgen, im 2. OG und DG Rohinstallationen in Kürze fertig
Haus B: Dachstuhl montiert, Dachpaket in Arbeit, Trennwände Wohnungen fertig
October 2025

House A: The carpentry work on the roof has been completed. Plumbing work is currently being carried out, after which the roof covering can be applied. Inside the building, the rough installations are underway. Work has started on the ETICS on the façade.
House B: The shuttering of the final reinforced concrete ceiling will begin shortly.
September 2025

The structural work on House A is nearing completion. The carpenter is currently erecting the roof truss, and the shell installation has already begun in the apartments. The reinforced concrete elements of the 1st floor of House B have been completed. The brickwork for the exterior walls will begin shortly, followed by the formwork for the ceiling above the first floor.
June 2025

The reinforced concrete ceiling above the first basement floor has been completed. Currently, the reinforced concrete supports and wall panels are being constructed on the ground floor, as well as the erection of the exterior walls using brick construction. The formwork for the reinforced concrete ceiling above the ground floor of House A will begin shortly.
May 2025

The start of the construction work has taken place and the ceiling above the 2nd UG has already been realized. Currently, the reinforced concrete elements in the 1st UG are being carried out and the formwork of the ceiling above the 1st UG will take place shortly.
February 2025

The excavation and work on securing the excavation pit could be continued as planned after Christmas. The construction site equipment is nearing completion and the construction company will soon begin with the foundations.
December 2024

The micropile wall has been erected, the excavation and the realization of the nail wall have begun.
October 2024

The demolition work on the existing buildings has begun and the excavation pit securing and excavation will be tackled subsequently.