Fussach
Liebera

Price advantage: Your dream apartment at a reduced purchase price
The last 3-room terrace apartments available
Completed and ready for occupancy

Time for change - including the price

Benefit now from the price advantage of the already completed and ready-to-occupy apartments in a beautiful location in Fußach. High-quality living at a reduced price. Turnkey apartments with top fittings await you here. Arrange a viewing now!

Living surrounded by Lake Constance and the Rhine - what could be better? The already completed and ready-to-move-in condominiums in the Liebera project in Fussach impressively combine those aspects that promise pure joie de vivre. Even the spaces around and between the four residential buildings are transformed into oases of calm with selected plants. A cozy feeling of serenity takes hold on the large terraces and continues into the interior of the varied apartments. The short distances to both daily shopping and the dreamlike shores of Lake Constance perfectly round off the residential bliss.

Choose your
dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

House
A B C D
Floors
Ground 1st Top
Number of rooms
2 3 4
Living space
40 m² 100 m²
Price
270000 550000
TOP (1) House Room floor Living space WBF Price Save
B13 House: B 3 Top 78.15 m² Residential construction funding 449000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
Living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

Surrounded by
natural treasures


The wonderful location is the foundation for the unparalleled quality of life and living in the Liebera project. The four residential buildings are being built at the end of a dead end, so peace and a feeling of deceleration are guaranteed. These characteristics are also provided by the surroundings, as Fussach is located in the Rhine Delta, which is known for its breathtaking beauty for good reason.

The areas on the Rhine and Lake Constance are habitat for numerous rare bird and plant species and are worth a visit at any time of year. From your new home, it is only 7 minutes by bike to the shores of Lake Constance. After another 7 minutes of cycling, you are already at the Rohrspitz. "Living where others go on vacation" applies across the board here.

To display the Google Maps map, loading the script must be allowed.
  • Local suppliers & service providers within walking distance, 7 minutes walk to the Spar
  • 9 minutes to the nearest bus stop, 10 minutes by bike to Hard-Fussach train station
  • Less than 10 minutes to the natural bathing beach, harbor, circular path Rheinlagunen, inner basin
  • Kindergarten, elementary school, secondary schools within easy walking or cycling distance

Construction progress

We would be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

May 2024

The Liebera project in Fußach was completed some time ago, and the apartments have been handed over to the owners. In glorious sunshine and with the lush greenery that has now taken hold in every corner, the beautiful complex is showing itself in its full splendor – we wish all residents much joy in their new home!
October 2023

In Fußach, construction work on the new Liebera project is progressing according to plan.
October 2023

The following work is currently being carried out:

– House A = Tiling of the stairwell, electrician completing work
– House B = Electrician completing work
– House C = Tiling of apartments, painters priming walls, laying terrace slabs
– House D = Painters priming walls

– General = Gardening work on House A and B, paving work
August 2023

House A: Tiling work, laying of terrace slabs. House B: Painting work, tiling work, laying of terrace slabs. House C: Closing drywall walls, rough installation of plumbing, sanitary, heating, and electrical systems, installation of screed. House D: Filling of drywall walls.

June 2023

House A: Fine plastering of interior walls, filling of drywall gypsum board walls ground Floor + 1st Floor
House B: Painting work, tiling work
House C: Erecting drywall walls, base coat of plaster in stairwell
House D: Closing drywall walls, rough installation of plumbing, sanitary, heating, and electrical systems, perimeter insulation, timber construction substructure for the facade
General: Canalization and excavation work in the area of House C/D
May 2023

House A: Screed laying in progress
House B: Facade is being completed, interior plaster is being applied, and painting work has begun
House C: Ceilings are being filled
House D: Windows are being installed, rough installations are being carried out, and interior plastering work has begun
April 2023

At House A, work is underway on the rough installation of plumbing, sanitary, heating, and electrical systems. At House B, the facade and screed work are in progress. At House C, the reinforcement is being installed for the ceiling of the 2nd Floor, and the electrical and plumbing, sanitary, heating installations are being carried out. At House D, work is being carried out on the temporary roof and the stripping of the ceiling of the 2nd Floor.
March 2023

The following work is currently in progress:
House A = Interior plaster
House B = Facade substructure, erecting drywall walls, rough installation of plumbing, sanitary, heating, and electrical systems
House C = Formwork for the ceiling of the 1st Floor
House D = Formwork/concreting of walls of the 2nd Floor and underground parking entrance
February 2023

The following work is currently taking place on the individual houses:
House A = Installation of windows, insulation of the main roof, roof skin, rough installation of plumbing, sanitary, heating, and electrical systems
House B = Facade substructure, filling of ceilings
House C = Concreting of the ground Floor ceiling
House D = Formwork/concreting of walls of the 1st Floor
February 2023

At House A, the underground parking entrance is being concreted. At House B, the windows are being installed, plastering work is being prepared, the main roof is being insulated, the roof skin is being installed, the substructure of the facade and the rough installations for plumbing, sanitary, heating, and electrical systems are being created, and the elevator is also being installed. At House C and D, the ceiling of the ground Floor is being shuttered.
January 2023

At House A and B, the plumber and electrician are busy with the rough installations in the basement. In addition, the insulation of the basement walls and underground parking is underway. At House B, the windows are currently being installed, and at House C, the walls of the ground Floor are being shuttered and concreted.
December 2022

At House A, the reinforcement is being installed for the ceiling of the 2nd Floor, and the concrete will be poured on December 19th. At House B, the elevator crossing and the overhangs in the area of the terraces are being concreted.
November 2022

Currently, the walls are being shuttered and concreted at House A. At House B, the ceiling on the 2nd Floor is being shuttered – the top Floor ceiling in this house.
October 2022

House A: Shuttering and concreting walls on the ground Floor. House B: Shuttering the ground Floor ceiling and moving the precast concrete parapets on the 1st Floor. Area of House A and B: Pulling sheet pile walls.
September 2022

Currently, the last two sections of the basement ceiling are being completed at House A. At House B, the ground Floor walls are being shuttered and concreted. At House D, the masonry walls are being... Learn more
September 2022

At House A, the walls of the basement are being concreted. At House B, the ceiling of the basement is being shuttered and concreted in sections. At House C and D, the excavation pit is being filled in each case.
August 2022

The floor slab of the common basement of House A and B is being completed, and the walls are also being shuttered and concreted.
Learn more
July 2022

Currently, the floor slabs are being concreted at House A and B. At House D, the walls in the basement are being concreted, and at House C, the ceiling of the basement is already being concreted.
June 2022

The floor slab in House C and D has been completed, and the walls are currently being concreted. At House A and B, the foundations are being concreted, the blinding layer is being applied, and the formwork for the floor slab is being made.
May 2022

The piling work was completed on Wednesday, and the working platform is currently being removed and the formation is being created.
April 2022

Currently, the excavation work is in full swing.
March 2022

The sheet piling work has just been completed. The water management system for the excavation pit is currently being installed.
January 2022

Construction began on January 31st – the project is scheduled for completion in spring 2024.
May 2021

Coming Soon: A glimpse of the property in Fußach where our new construction project, Liebera, will be built.