Klaus
Im Riesacker

Price advantage: Your dream apartment at a reduced purchase price
2- and 3-room ground-floor apartments available
Completed and ready for occupancy

Time for change - even in terms of price!

Benefit now from the price advantage of the already completed and ready-to-occupy garden apartments in a quiet location in Klaus. High-quality living at a reduced price. Arrange a viewing now!

In Klaus, ZIMA has realized a modern residential ensemble with clear architecture and high-quality materials. The combination of straightforward design and the varied façade made of plaster and wood gives the buildings a timeless character.

 

Panoramic glazing combined with the high-quality ZIMA basic fittings ensure light-flooded, friendly living spaces. Well thought-out floor plans and an elevator in both buildings enable comfortable, barrier-free living

Ready-to-occupy garden apartments with first-class fittings and generous open spaces are available. A shared underground garage with ample parking spaces, practical bicycle rooms, cellar compartments and a children's playground complete the attractive overall offer.

Choose your
dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

House
A B
Floors
Ground 1st Top
Number of rooms
2 3 4
Living space
40 m² 140 m²
Price
320000 1160000
TOP (3) House Room floor Living space WBF Price Save
B02 House: B 2 Ground 59.38 m² Residential construction funding 399000
B01 House: B 3 Ground 79.81 m² Residential construction funding 559000
A02 House: A 3 Ground 83.57 m² Residential construction funding 579000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
Living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

Idyll between
Forest & Meadows


The municipality of Klaus boasts numerous hours of sunshine, peace and quiet, recreation between idyllic forests and meadows, as well as magnificent views of the region, such as at the Lourdes Chapel on the Tschütsch. The surroundings of Klaus are particularly charming due to the fruit and wine growing and the beautiful hillside locations. From the nearby walking and hiking trails, those seeking peace and quiet can catch wonderful views of the upper Rhine Valley as far as the Swiss mountains. Thanks to the short distances to local suppliers, schools, doctors and bus and train stops, the future residents of the new building project "Im Riesacker" are guaranteed a comfortable and family-friendly everyday life. The Union Tennis Club Klaus or the mini-golf course offer variety in everyday life. Due to its location in the middle of the Rhine Valley, the other routes are also short - regardless of whether you want to go further towards Oberland or Unterland. Welcome to your new home, welcome to Klaus!

To display the Google Maps map, loading the script must be allowed.
  • ADEG, Spar, butcher, bakery reachable in 7 minutes by bike
  • Klaus train station only 3 minutes by bike, Treietstraße bus stop within easy walking distance
  • Wonderful hiking and walking trails in the surrounding area
  • Kindergarten, elementary and middle school only 10 minutes away on foot

Features


ZIMA basic equipment – high-quality, clear design
Bathrooms and WC rooms are furnished with modern, high-quality bathroom and sanitary equipment from well-known manufacturers. Simple, elegant design combines with high-quality materials such as glass, metal and porcelain stoneware.

The ZIMA basic features focus on a clear design language and first-class workmanship. With elegant wooden parquet flooring, a lively and warm living atmosphere is created, which gives your living spaces a special touch. Proven laying methods and the high quality of the raw material are just as much in focus as consistent sound insulation and a harmonious overall concept in your home.

CONSTRUCTION PROGRESS

We would be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

February 2025

Cleaning work is currently taking place in House A. In House B, the doors are being installed and painting work is being carried out in the stairwell.
November 2024

The elevator doors are being painted in both buildings and painting work is taking place in the apartments in House A. Tiling work is currently being carried out in House B.
October 2024

The facade formwork is currently being installed and the drywall walls are being filled in House A. In House B, the ETICS and the substructure of the wooden facade are being created and the underfloor heating is being laid.
September 2024

In September, the substructure for the facade was installed on House A and the drywall walls in the apartments were completed. The drywall walls were also in progress at House B and the facade thermal insulation composite system was produced.
August 2024

At the end of August, the structural work was completed and the building seals, HSL and electrical rough installations and the interior plastering work were carried out in House A.
June 2024

The following work is currently taking place: HSL cellar distribution of waste and rain water, concreting the walls of the 2nd top floor of House A, concreting the walls of the 1st top floor of House B
May 2024

The walls are currently being bricked and concreted on the 1st top floor of House A. The ceiling of the ground floor of House B is being formworked and concreted.
April 2024

The excavation pit is currently being filled and the embankments for parking spaces are being installed. In addition, the ceiling of the ground floor of House A is being formworked and the ceiling of the basement is being sealed. The building waterproofing and the formwork and concreting of the underground parking entrance ramp of House B is also underway.
March 2024

On the construction site in Klaus, the ceiling in the basement of House B is currently being formworked and concreted. At the end of week 12, House A will begin formworking and concreting the walls on the ground floor.
February 2024

The walls are currently being formworked and concreted in the basement.
January 2024

The foundations are currently being concreted and the main pipes are being laid on the construction site in Klaus. Furthermore, the geothermal probe pipes are connected to the precast piles.
November 2023

The excavation work has begun.
September 2023

Construction work for the Riesacker project will begin in this wonderful location in Klaus in October.