Dornbirn
Haferweg

Including residential construction funding
2- to 4-room Condominiums
Construction has already started, planned completion end of 2026

The residential project on Haferweg in Dornbirn presents itself as an ensemble of three clearly structured buildings in a neighborhood characterized by single-family homes. Each of the three-story residential buildings has a variety of floor plans and thus individual living spaces for every situation in life. In the 25 units, living comfort is brought to the point. Floor-to-ceiling windows provide plenty of light in the living rooms, and the covered terraces and balconies offer the possibility of cozy hours outdoors. Here you can fully enjoy the peaceful surroundings.

Green spaces and seating areas between the buildings enhance the overall appearance of the residential complex. Visitor parking spaces and covered bicycle parking spaces allow for relaxed coming and going. With the shared underground car park, a lift in every residential building and separate cellar compartments, you can live here without any worries.

Choose
your dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

House
A B C
Floors
Ground 1st Top
Number of rooms
2 3 4 5
Living space
40 m² 130 m²
Price
310000 1120000
TOP (10) House Room floor Living space WBF Price Save
C06 House: C 3 1st 65.44 m² Residential construction funding 469000
B05 House: B 3 1st 62.19 m² 474000
B04 House: B 2 1st 49.13 m² Residential construction funding 375000
B01 House: B 4 Ground 99.49 m² Residential construction funding 739000
A08 House: A 3 Top 65.44 m² 509000
A07 House: A 2 Top 46.81 m² Residential construction funding 359000
A06 House: A 3 1st 62.19 m² Residential construction funding 464000
A04 House: A 3 1st 65.44 m² Residential construction funding 499000
A03 House: A 2 1st 46.81 m² Residential construction funding 349000
A02 House: A 4 Ground 100.28 m² Residential construction funding 739000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
Living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

Where quality of life
is at home


The location in the quiet neighborhood on Haferweg offers all the advantages you could want from a cozy home. There are numerous cycling and walking paths towards Ried to discover practically right on your doorstep. Everything you need for a comfortable daily life is also in the immediate vicinity. A bus stop directly in front of the door will take you to the nearby Messepark, for example. All purchases can also be made quickly by bike from your new home. Kindergartens and schools are also within easy reach. The Hermann-Gmeiner-Park offers another leisure activity just a 5-minute walk from Haferweg. The residential area thus offers a high quality of life for young and old.

To display the Google Maps map, loading the script must be allowed.
  • Short distances to Messepark, local suppliers within walking distance
  • Erlgrund bus stop in front of the door, 3 minutes by bike to Hatlerdorf train station
  • Hermann-Gmeiner-Park around the corner, walking and cycling paths towards Ried in front of the door
  • Kindergarten in the immediate vicinity, schools within easy walking distance

Features


ZIMA basic features – high-quality, clear design

Bathrooms and WC rooms are equipped with modern, high-quality bathroom and sanitary fittings from well-known manufacturers. Simple, elegant design combines with high-quality materials such as glass, metal and porcelain stoneware.

The ZIMA basic features focus on a clear design language and first-class workmanship. With elegant wooden parquet flooring, a lively and warm living atmosphere is created, which gives your living spaces a special touch. Proven laying methods and the high quality of the raw material are just as much in focus as consistent sound insulation and a harmonious overall concept in your home.

Smart Home & digital building management as well as a digital locking system complement the equipment package with modern technologies that raise comfort, security and efficiency to a new level.

CONSTRUCTION PROGRESS

We would be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

November 2025

Von Haus A werden die Wände des EG betoniert und gemauert. Von Haus Haus B werden die Wände des EG ebenfalls betoniert. Bei Haus C laufen die Arbeiten an der Decke über dem EG.
October 2025

Von Haus A und B ist die Decke des UG fertiggestellt – ebenfalls fertig ist das Rampengebäude. Von Haus Haus C stehen bereits die Wände des EG.
October 2025

The sheet piling is currently being installed and backfilling work is taking place.
September 2025

The final basement ceiling is currently being concreted and backfilling work is taking place.
September 2025

The ramp driveway is currently being concreted and formwork work is being carried out on the basement ceiling at House B. At the same time, concreting work is being carried out on the basement ceiling at House C.
August 2025

The basement walls and the basement ceiling in Haferweg are currently being concreted.
July 2025

The fourth and final part of the base plate has been concreted. Walls are currently being concreted and the cellar ceiling is being shuttered.
July 2025

The second construction crane has already been erected, part two of four floor slabs has been concreted and the first basement walls have already been concreted.
June 2025

The first section of the floor slab has been concreted.
June 2025

The pilot work has been completed and the construction crane has been erected. Excavation for the foundations is in progress.
May 2025

Excavation and pilot work are currently taking place.
May 2025

Excavation work and the installation of the sheet piling equipment are currently underway.
March 2025

The sheet piling work has been completed and the groundwater lowering will start today, Friday, 07.03.
February 2025

The demolition work on the existing building on Haferweg is nearing completion and the preparatory work by the builder is underway.